Check the listed compatible models and specs before you order. Questions? Email us.
PAJ GPS
PAJ GPS Compact Finder 4G GPS Tracker for Cars
Free U.S. shipping and free 30-day returns. Check the compatible models in the description below.
In stock. Ships free, usually within 1–4 business days.
Free tracked shipping and secure checkout on every U.S. order.
Free shipping
iFree tracked shipping on every order. Most orders arrive within 3–8 business days.
Free 30-day returns
iReturn eligible items within 30 days of delivery for a full refund. We email you a prepaid return label.
Peak-demand shipping delays
iDuring high demand, deliveries may experience short carrier delays. Tracking updates remain active for every order.
Email support
Questions about fit or an order? Email nexoltic@gmail.com. We reply on business days (Mon–Fri).
Terms quick view
Free returns within 30 days of delivery: full refund with a prepaid return label.
Every U.S. order ships free. Eligible items can be returned within 30 days of delivery for a full refund, with a free prepaid return label.
Product details
The PAJ GPS COMPACT Finder 4G is a pocket-size magnetic GPS tracker that delivers 4G live location, configurable alarms, and up to 40 days of standby battery life to protect cars, motorcycles, trucks and other valuables.
Small enough to hide under a vehicle or slip into luggage, the COMPACT Finder 4G pairs 4G LTE connectivity with a built-in global SIM to provide continuous position data and event notifications. Use the Finder Portal or the mobile app to view routes, set geofences and receive instant alerts for movement, removal or low battery. The device is designed for long deployments and varied assets—cars, campers, bikes, boats or even personal items that need extra security.
How does the COMPACT Finder 4G keep track of moving vehicles?
It uses 4G LTE networks combined with GPS position fixes to report live locations to the PAJ Finder platform. Location history is stored and available for review, letting you trace routes for up to 365 days through the web portal.
- Real-time tracking with 4G LTE connectivity for accurate position updates.
- Detailed travel history accessible in the Finder Portal for up to 365 days.
- Works globally thanks to the integrated SIM and wide network coverage.
What alarms and notifications can I get for theft or unexpected movement?
The tracker sends immediate alerts to the app and by email for several conditions, so you can react quickly. Notifications are configurable so they match how you want to be informed for vibration, movement, geofence events, speeding, device removal and low battery.
- Instant app and email alerts for movement and vibration detection.
- Geofence entry/exit alarms to monitor areas like driveways or parking spots.
- Device removal and low battery warnings to detect tampering or power loss.
How long does the battery last in real-world use and how is the device mounted?
The COMPACT Finder 4G uses a 3.7V 5000 mAh Li-ion cell that can reach up to 40 days in standby and roughly 20 days with frequent active reporting, depending on reporting intervals and coverage conditions. It features a built-in magnet for fast, secure attachment to metal chassis, or it can be concealed in luggage and non-metallic compartments.
- 3.7V 5000 mAh battery supports extended deployments up to 40 days standby.
- Approximately 20 days typical active operation with regular updates.
- Strong integrated magnet for quick mounting on vehicle undersides or frames.
Do I need a subscription and what do I get with the service?
Yes — a subscription is required because the device uses a built-in SIM for worldwide data transmission. PAJ offers flexible plans from Basic to Premium, includes 24/7 multilingual support and lifetime device replacement for registered units.
- Integrated SIM card with global coverage; subscription plans start at $5.50/month.
- Free Android and iOS app plus Finder Portal for desktop route and device management.
- Customer support available around the clock and lifetime device replacement policy.
Who is this for: The PAJ GPS COMPACT Finder 4G suits vehicle owners, fleet managers and travelers who want an unobtrusive, long-life tracker for theft protection, recovery and route logging. It’s ideal for people needing a compact tracker that mounts magnetically, supports global tracking, and provides configurable alarms—useful for cars, motorcycles, trucks, campers, bicycles, luggage, or valuable portable gear.
FAQ
Q: How long will the battery last on a single charge?
A: The 3.7V 5000 mAh battery gives up to 40 days standby and typically around 20 days with regular active tracking.
Q: Does the device work outside my country?
A: Yes. The COMPACT Finder includes a built-in SIM and supports global tracking, with coverage in Australia and internationally.
Recently viewed products
Product quick view
Product
Added to cart