Premium electronics accessories quality selected for United States (USA) customers.
Trak-4
Trak-4 Solar GPS Tracker — Waterproof Global Tracking for Trailers, Equipment & Vehicles
High-performance electronics accessories made for confident daily results
3 shoppers currently have this item in cart.
In stock and ready to ship with free delivery.
Fast dispatch with always-free shipping and secure checkout on every order.
Free shipping
iFree shipping on every order. Fast dispatch, tracked delivery, and secure checkout included.
Easy returns
iSimple return flow and responsive support for eligible items.
Peak-demand shipping delays
iDuring high demand, deliveries may experience short carrier delays. Tracking updates remain active for every order.
24/7 customer support
Questions before checkout? Our team is available and ready to help.
Terms quick view
100% money-back guarantee for eligible returns.
Orders include free shipping. Returns and service terms may vary by item eligibility and destination.
Why customers choose Nexoltic
Overview
Trak-4 Solar is built to be waterproof and durable, designed to provide worry-free tracking without frequent charging. In direct sunlight it trickle-charges its internal battery, enabling extended operation. When reporting daily, the battery can power tracking for 12–18 months between charges, while you can also choose higher frequencies when moving, down to every 15 minutes. It uses 4G LTE with a fallback to 2G to maintain a reliable connection, and it blends GPS with Wi-Fi based location for indoor areas where satellite signals are weak.
Global connectivity and precision
Trak-4 Solar operates worldwide, leveraging LTE with a robust fallback to 2G. It supports multiple GNSS systems including GPS and GLONASS for accurate positioning. When GPS is less reliable, it can detect nearby Wi-Fi routers’ MAC IDs and reference Google’s Wi-Fi database for indoor tracking accuracy. A subscription is required, with plans starting at 9.99 per month when billed annually or 16.99 per month for flexible month-to-month plans.
Rugged design and flexible installation
Designed for all-weather use, Trak-4 Solar is waterproof and built to last. It measures 4.6 by 2.3 by 1.3 inches and houses a high-capacity battery plus all necessary accessories. While in direct sun it will trickle charge and continue reporting even when sunlight is scarce, making it ideal for extended tracking. The optional Trak-4 Mag Kit offers high-strength magnets to attach the unit to steel surfaces.
Out of the box and in the field
Trak-4 Solar is ready to use in minutes. It ships with smartphone apps for Android and iOS, plus a web interface, and provides real-time alerts via email and SMS. You can track speed, geofence crossings, movement, and low battery state to stay informed about your assets.
Flexible mounting and placement
Mounting options include permanent screw mounts, double-sided tape for versatile adhesion, built-in slots for zip ties or straps, and the Mag Kit for steel surfaces. These choices let you place Trak-4 Solar on trailers, cargo, pallets, equipment, or vehicles in a way that fits your setup.
Key capabilities
- Solar powered operation with trickle charging in sunlight
- Battery life up to 12–18 months when reporting daily
- Flexible reporting frequencies from daily to every 15 minutes when moving
- 4G LTE with automatic fallback to 2G for broad coverage
- GPS plus Wi-Fi based location for indoor tracking
- Global operation with multi GNSS support including GPS and GLONASS
- Indoor tracking via Wi-Fi MAC IDs and Google database
- Out-of-the-box apps on Android, iOS, and web with real-time alerts
- Lifetime warranty and quick setup
Ideal use cases
- Asset tracking for trailers, cargo, pallets, and equipment
- Fleet management and vehicle monitoring
- Tracking in remote or sun-exposed sites with extended battery life
- Secure placement with versatile mounting options including magnets
FAQ
Q: What can I track with Trak-4 Solar?
A: Track trailers, equipment, vehicles, and assets worldwide with solar-powered reliability and real-time alerts.
Q: What mounting options are available?
A: Permanent screw mounts, double-sided tape, zip ties, or the optional Mag Kit for steel surfaces.
Recently viewed products
Product quick view
Product
Added to cart