PAJ GPS

PAJ GPS Allround Finder 4G Real-Time GPS Tracker

Free U.S. shipping and free 30-day returns. Check the compatible models in the description below.

$63.26

In stock. Ships free, usually within 1–4 business days.

Shop Pay installment options may appear at checkout where eligible.

Free shipping Secure checkout Free 30-day returns
Spare Keep a spare (2)

Check the listed compatible models and specs before you order. Questions? Email us.

Multi-device One for each device (3)

Free tracked shipping and secure checkout on every U.S. order.

Free shipping

i

Free tracked shipping on every order. Most orders arrive within 3–8 business days.

Free 30-day returns

i

Return eligible items within 30 days of delivery for a full refund. We email you a prepaid return label.

Peak-demand shipping delays

i

During high demand, deliveries may experience short carrier delays. Tracking updates remain active for every order.

Email support

Questions about fit or an order? Email nexoltic@gmail.com. We reply on business days (Mon–Fri).

Share

Product details

PAJ Allround Finder 4G is a compact real-time GPS tracker that monitors cars, motorcycles, bags and people with 4G connectivity, a long-life 5,000 mAh battery, SOS and theft alerts. The Allround Finder 4G combines precise live location updates with multi-network 4G coverage and an integrated SIM, letting you view positions in the PAJ Portal V2 app or a web browser. Designed for daily use, it balances robust battery life, practical alert features and splash-resistant construction so you can protect vehicles, equipment or vulnerable loved ones without bulky hardware.

How quickly does the Allround Finder 4G report a location?

Location reporting is delivered in real time via 4G, giving frequent position updates when the device has cellular coverage. You can check live movement in the PAJ Portal V2 app or browser and review stored route history if you need past positions.

  • Integrated 4G multi-network SIM for steady connectivity
  • Live tracking visible in app and web portal
  • Adjustable reporting intervals for power or precision needs
  • Up to 365 days of route history with the appropriate subscription

What alerts and safety features are available?

The tracker sends instant notifications for events such as shocks, SOS button presses, geofence entries/exits, high speed and low battery so you can act quickly. Alerts come through push notifications or email depending on your settings in the PAJ Portal V2.

  • SOS button for immediate emergency signalling
  • Shock detection to flag sudden movement or tampering
  • Custom geofence setup to notify when a device leaves or enters an area
  • Speed and low-battery warnings to monitor behaviour and device status

How long does the battery last in everyday use?

The built-in 5,000 mAh battery supports approximately 20 days of typical use and can reach up to about 60 days in standby mode, depending on reporting frequency and signal conditions. That balance of capacity and size makes the device suitable for intermittent or extended monitoring without constant recharging.

  • 5,000 mAh battery capacity for extended runtime
  • Variable lifespan depending on update intervals and connectivity
  • Standby mode extends battery life up to around 60 days
  • Compact form factor suitable for vehicles, bags or carried use

Can I use the tracker internationally and how do subscriptions work?

The Allround Finder 4G works in more than 100 countries thanks to its 4G multi-network SIM, so you won’t need to swap cards when traveling across borders. After activating the device, choose a Basic or Premium subscription to unlock real-time tracking, route history and 24/7 customer support.

  • Global coverage in 100+ countries with no extra roaming costs
  • Subscription plans start from around 5.50 USD per month
  • Premium tiers add longer history retention and advanced features
  • Lifetime device warranty while the tracker remains active
Who is this for The PAJ Allround Finder 4G fits owners who want reliable, set-and-forget tracking for vehicles, rentals, luggage, tools or family members—especially when travel or cross-border use is involved. It suits people who value live updates, configurable alerts and long battery intervals without a bulky device, and who plan to use a subscription service for history and support.

FAQ

Q: Do I need a separate SIM card for the tracker?

A: No. The Allround Finder 4G includes an integrated multi-network SIM, so you can activate it without buying a separate card.

Q: How long is route history stored?

A: With an active subscription you can store route history up to 365 days, depending on the chosen plan.